---
description: ¿Qué piensan los usuarios de Oracle Primavera Cloud? Lee las reseñas y opiniones verificadas, descubre sus características y el nivel de usabilidad, consulta los precios y conoce las ventajas y desventajas de Oracle Primavera Cloud gracias a Capterra Colombia.
image: https://gdm-localsites-assets-gfprod.imgix.net/images/capterra/og_logo-e5a8c001ed0bd1bb922639230fcea71a.png?auto=format%2Cenhance%2Ccompress
title: Oracle Primavera Cloud - Opiniones, precios y características - Capterra Colombia 2026
---

Breadcrumb: [Inicio](/) > [Software de gestión de obras](/directory/30057/construction-management/software) > [Oracle Primavera Cloud](/software/181380/oracle-primavera)

# Oracle Primavera Cloud

Canonical: https://www.capterra.co/software/181380/oracle-primavera

Página: 1 de 9\
Siguiente: [Página siguiente](https://www.capterra.co/software/181380/oracle-primavera?page=2)

> Oracle Primavera es la solución más potente, robusta y fácil de usar para planificar, gestionar y ejecutar proyectos de cualquier tamaño.
> 
> Veredicto: 182 usuarios lo han valorado con **4.4/5**. De los mejores valorados en **Probabilidad de recomendación**.

-----

## Vista rápida

### ¿Quién usa Oracle Primavera Cloud?

Ingeniería y construcción&#10;Energía y recursos&#10;Sector público&#10;Fabricación

## Estadísticas y valoraciones rápidas

| Métrica | Calificación | Detalles |
| **En general** | **4.4/5** | 182 Opiniones |
| Facilidad de uso | 3.7/5 | Basado en las opiniones generales |
| Asistencia al cliente | 4.0/5 | Basado en las opiniones generales |
| Relación calidad-precio | 4.0/5 | Basado en las opiniones generales |
| Funciones | 4.4/5 | Basado en las opiniones generales |
| Porcentaje de recomendaciones | 80% | (8/10 Probabilidad de recomendación) |

## Sobre el proveedor

- **Empresa**: Oracle
- **Ubicación**: Chicago, EE. UU.
- **Constitución**: 1977

## Contexto comercial

- **Precio inicial**: US$ 100,00
- **Público objetivo**: Trabajador autónomo, 2-10, 11-50, 51-200, 201-500, 501-1.000, 1.001-5.000, 5.001-10.000, 10.000+
- **Despliegue y plataformas**: Cloud, SaaS, Web, Windows (local), Linux (local)
- **Idiomas admitidos**: alemán, chino, chino tradicional, coreano, español, francés, inglés, italiano, japonés, neerlandés, portugués, ruso
- **Países disponibles**: Alemania, Australia, Canadá, Estados Unidos, Reino Unido

## Funciones

- Acceso móvil
- Budget Tracking
- Calendario de personal
- Estimación de costes
- Gestión de capacidades
- Gestión de control de horas
- Gestión de documentos
- Gestión de ofertas
- Gestión de tareas
- Gestión de órdenes de cambio
- Herramientas de colaboración
- Informes de avance
- Panel de comunicaciones
- Planificación de proyectos
- Planificación de proyectos
- Priorización
- Programación
- Programación de recursos
- Programación de trabajos
- Seguimiento de competencias
- Seguimiento del proyecto
- Seguimiento del tiempo
- Varios proyectos
- Vista de Gantt/cronología

## Integraciones (en total: 6)

- Assignar
- Oracle Aconex
- Primavera Unifier
- Primavera Unifier Accelerator
- Reconstruct
- Zapier

## Opciones de asistencia

- Preguntas frecuentes/foro
- Asistencia telefónica
- Asistencia 24/7
- Chat

## Categoría

- [Software de gestión de obras](https://www.capterra.co/directory/30057/construction-management/software)

## Categorías relacionadas

- [Software de gestión de obras](https://www.capterra.co/directory/30057/construction-management/software)
- [Software de programación para constructoras](https://www.capterra.co/directory/31522/construction-scheduling/software)
- [Software de gestión de carteras de proyectos](https://www.capterra.co/directory/30862/project-portfolio-management/software)
- [Software de gestión de propiedades inmobiliarias](https://www.capterra.co/directory/20050/real-estate-property-management/software)
- [Other Construction Software](https://www.capterra.co/directory/34536/other-construction/software)

## Alternativas

1. [Procore](https://www.capterra.co/software/56250/procore) — 4.5/5 (2680 reviews)
2. [Smartsheet](https://www.capterra.co/software/79104/smartsheet) — 4.5/5 (3579 reviews)
3. [monday AI Workspace](https://www.capterra.co/software/147657/monday-com) — 4.6/5 (6134 reviews)
4. [Buildertrend](https://www.capterra.co/software/70092/buildertrend) — 4.5/5 (2489 reviews)
5. [Visual Planning](https://www.capterra.co/software/91852/visual-planning) — 4.5/5 (128 reviews)

## Opiniones

### "Market leader scheduling and planning software" — 5.0/5

> **Amjad** | *23 de octubre de 2019* | Transporte marítimo | Valoración de la recomendación: 8.0/10
> 
> **Puntos a favor**: - has everything required for project scheduling using critical path method (WBS, activities, cost and resource loading)&#10;- Global change offers an unbelievably powerful solution to change thousands of activities on the fly.&#10;- Can handle very large schedules that include tens of thousands of activities at ease.&#10;- Works using databases rather than project files which makes it suitable for working on many projects and offers many types of databases (Oracle, SQL server, SQLite)&#10;- supports single or multiple users&#10;- now has the EPPM version which is cloud-based and has improved immensely over the years
> 
> **Puntos en contra**: - It shines for large and complex projects, for smaller and simpler schedules it tends to be more cumbersome.&#10;- It requires a very good understanding of how the software and CPM work when analysing results. Otherwise; mistakes can be done easily&#10;- While powerfull, the reporting feature of the Pro version (Standalone) looks antiquated in comparison to the EPPM cloud version. &#10;- The standalone version has not received any important feature updates for years.&#10;- Lacks the seamless integration with MS Office that MS Project has&#10;- Requires IT assistance to migrate the database from one computer to another
> 
> It was my daily driver for years and despite the steep learning curve, it was an extremely capable tool.

-----

### "Excellent Project Tracking and Accounting Options are Effective." — 5.0/5

> **Hannah** | *11 de julio de 2023* | Construcción | Valoración de la recomendación: 9.0/10
> 
> **Puntos a favor**: The support on various Accounting platform integration and the stability of it's Mobile Access is amazing and the project document management this Oracle solution is the best choice.
> 
> **Puntos en contra**: Easy customization of various features on this Oracle product and I never experienced any error using this software.
> 
> Effective tracking and project financial planning and risk management product with various responsive features and the permission management capability is great.

-----

### "Satisfactory" — 3.0/5

> **NIKHIL** | *17 de octubre de 2017* | Biotecnología | Valoración de la recomendación: 7.0/10
> 
> **Puntos a favor**: I liked the P6 in particular as a Scheduling Software as it allows me to perform additional tasks which are unable on Microsoft Project. I like the part where you can bunch a group of activities to be performed by a particular resource using a unique identification code and it can be useful on big projects where a resource just needs to know his part in the overall schedule
> 
> **Puntos en contra**: I was not happy with the software for particularly smaller projects and since there are licensing fees associated with the product it does not make sense to use it for smaller projects. Microsoft Project is a pretty decent scheduling software on its own to carry out projects and it also saves us the trouble of training people on the new software
> 
> I was able to use the P6 software on multi million dollar projects and it played a great role in improving the efficiency of the work and keeping track of critical deliverables

-----

### "Project Scheduling Software that works" — 4.0/5

> **Muhammed Anshad** | *12 de abril de 2020* | Construcción | Valoración de la recomendación: 8.0/10
> 
> **Puntos a favor**: Oracle Primavera P6 is one of the best Project Scheduling tool that works on Critical path Method. I like the following features the most&#10;- Vast integration capability with Web, EPPM, Primavera Mobile and other oracle tools&#10;- Ability to generate large amount of data especially in the form of spreadsheet&#10;- Fully functional Earned Value Management
> 
> **Puntos en contra**: The software UI is old style and the options are not properly organised. There are some software bugs that are still persistent and oracle has been very slow in debugging them.
> 
> No doubt, it's the best project scheduling tool that is available for construction industry till date. Overall I would prefer this software over any other similar software for its pros mentioned.

-----

### "Best tool to manage portfolio" — 5.0/5

> **Swapnil** | *1 de diciembre de 2023* | Petróleo y energía | Valoración de la recomendación: 9.0/10
> 
> **Puntos a favor**: There is a option to view n number of projects at a time with progress comparison
> 
> **Puntos en contra**: Initial loading takes a bot longer time.

-----

Página: 1 de 9\
Siguiente: [Página siguiente](https://www.capterra.co/software/181380/oracle-primavera?page=2)

## Enlaces

- [Ver en Capterra](https://www.capterra.co/software/181380/oracle-primavera)

## Esta página se encuentra disponible en los siguientes idiomas

| Local | URL |
| de | <https://www.capterra.com.de/software/181380/oracle-primavera> |
| de-AT | <https://www.capterra.at/software/181380/oracle-primavera> |
| de-CH | <https://www.capterra.ch/software/181380/oracle-primavera> |
| en | <https://www.capterra.com/p/145503/Oracle-Primavera/> |
| en-AE | <https://www.capterra.ae/software/181380/oracle-primavera> |
| en-AU | <https://www.capterra.com.au/software/181380/oracle-primavera> |
| en-CA | <https://www.capterra.ca/software/181380/oracle-primavera> |
| en-GB | <https://www.capterra.co.uk/software/181380/oracle-primavera> |
| en-IE | <https://www.capterra.ie/software/181380/oracle-primavera> |
| en-IL | <https://www.capterra.co.il/software/181380/oracle-primavera> |
| en-IN | <https://www.capterra.in/software/181380/oracle-primavera> |
| en-NZ | <https://www.capterra.co.nz/software/181380/oracle-primavera> |
| en-SG | <https://www.capterra.com.sg/software/181380/oracle-primavera> |
| en-ZA | <https://www.capterra.co.za/software/181380/oracle-primavera> |
| es | <https://www.capterra.es/software/181380/oracle-primavera> |
| es-AR | <https://www.capterra.com.ar/software/181380/oracle-primavera> |
| es-CL | <https://www.capterra.cl/software/181380/oracle-primavera> |
| es-CO | <https://www.capterra.co/software/181380/oracle-primavera> |
| es-CR | <https://www.capterra.co.cr/software/181380/oracle-primavera> |
| es-DO | <https://www.capterra.do/software/181380/oracle-primavera> |
| es-EC | <https://www.capterra.ec/software/181380/oracle-primavera> |
| es-MX | <https://www.capterra.mx/software/181380/oracle-primavera> |
| es-PA | <https://www.capterra.com.pa/software/181380/oracle-primavera> |
| es-PE | <https://www.capterra.pe/software/181380/oracle-primavera> |
| fr | <https://www.capterra.fr/software/181380/oracle-primavera> |
| fr-BE | <https://fr.capterra.be/software/181380/oracle-primavera> |
| fr-CA | <https://fr.capterra.ca/software/181380/oracle-primavera> |
| fr-LU | <https://www.capterra.lu/software/181380/oracle-primavera> |
| it | <https://www.capterra.it/software/181380/oracle-primavera> |
| nl | <https://www.capterra.nl/software/181380/oracle-primavera> |
| nl-BE | <https://www.capterra.be/software/181380/oracle-primavera> |
| pt | <https://www.capterra.com.br/software/181380/oracle-primavera> |
| pt-PT | <https://www.capterra.pt/software/181380/oracle-primavera> |
| sv | <https://www.capterra.se/software/181380/oracle-primavera> |

-----

## Datos estructurados

<script type="application/ld+json">
  {"@context":"https://schema.org","@graph":[{"name":"Capterra Colombia","address":{"@type":"PostalAddress","addressLocality":"Ciudad de México","addressRegion":"CMX","postalCode":"CP 11000","streetAddress":"Boulevard Manuel Ávila Camacho no. 36, Piso 10 Col. Lomas de Chapultepec CP 11000 México, D.F"},"description":"Capterra Colombia ayuda a millones de usuarios a encontrar el software adecuado. Descubre opiniones, valoraciones, infografías y las listas más exhaustivas de software empresarial.","email":"info@capterra.co","url":"https://www.capterra.co/","logo":"https://dm-localsites-assets-prod.imgix.net/images/capterra/logo-a9b3b18653bd44e574e5108c22ab4d3c.svg","@id":"https://www.capterra.co/#organization","@type":"Organization","parentOrganization":"G2.com, Inc.","sameAs":["https://twitter.com/capterra","https://www.facebook.com/Capterra/","https://www.linkedin.com/company/capterra","https://www.instagram.com/capterra/","https://www.youtube.com/user/CapterraTV"]},{"name":"Oracle Primavera Cloud","description":"El paquete de software Oracle Primavera ofrece aplicaciones potentes, robustas y fáciles de usar, en la nube y de manera local, para priorizar, planificar, administrar y entregar a escala global carteras, proyectos y programas con éxito.\n\nDesde la programación de proyectos, los controles de costos y proyectos, la gestión de carteras, la gestión de documentos y las analíticas hasta el análisis de riesgos, Oracle Primavera permite que constructores, ingenieros y directores de proyectos en sectores con gran cantidad de activos mejoren los resultados en todo el ciclo de vida del proyecto.","image":"https://gdm-catalog-fmapi-prod.imgix.net/ProductScreenshot/435a05d1-defd-4a40-961f-594ebcb0f3cd.png","url":"https://www.capterra.co/software/181380/oracle-primavera","@id":"https://www.capterra.co/software/181380/oracle-primavera#software","@type":"SoftwareApplication","applicationCategory":"BusinessApplication","publisher":{"@id":"https://www.capterra.co/#organization"},"aggregateRating":{"@type":"AggregateRating","ratingValue":4.4,"bestRating":5,"ratingCount":182},"offers":{"price":"100","@type":"Offer","priceCurrency":"USD"},"operatingSystem":"Cloud, Windows on premise, Linux on premise"},{"@id":"https://www.capterra.co/software/181380/oracle-primavera#faqs","@type":"FAQPage","mainEntity":[{"name":"¿Qué es Oracle Primavera Cloud?","@type":"Question","acceptedAnswer":{"text":"El paquete de software Oracle Primavera ofrece aplicaciones potentes, robustas y fáciles de usar, en la nube y de manera local, para priorizar, planificar, administrar y entregar a escala global carteras, proyectos y programas con éxito.Desde la programación de proyectos, los controles de costos y proyectos, la gestión de carteras, la gestión de documentos y las analíticas hasta el análisis de riesgos, Oracle Primavera permite que constructores, ingenieros y directores de proyectos en sectores con gran cantidad de activos mejoren los resultados en todo el ciclo de vida del proyecto.","@type":"Answer"}},{"name":"¿Quién usa Oracle Primavera Cloud?","@type":"Question","acceptedAnswer":{"text":"Ingeniería y construcciónEnergía y recursosSector públicoFabricación","@type":"Answer"}}]},{"@id":"https://www.capterra.co/software/181380/oracle-primavera#breadcrumblist","@type":"BreadcrumbList","itemListElement":[{"name":"Inicio","position":1,"item":"/","@type":"ListItem"},{"name":"Software de gestión de obras","position":2,"item":"/directory/30057/construction-management/software","@type":"ListItem"},{"name":"Oracle Primavera Cloud","position":3,"item":"/software/181380/oracle-primavera","@type":"ListItem"}]}]}
</script>
